Menu
Home
Post Something
Forums
Current Activity
New posts
Search forums
What's new
New posts
Latest activity
News & Features
The Marketplace
Cars for Sale
Engine and Performance
Chassis and Wheels
Exterior and Body
Interior and Cockpit
ICE - In Car Entertainment
Car Shops and Services
Toys and Wares
All Other Stuff
Jobs and Vacancies
Looking For
Members
Log in
Register
What's new
Search
Search
Search titles only
By:
Cars for Sale
Engine and Performance
Chassis and Wheels
Exterior and Body
Interior and Cockpit
ICE - In Car Entertainment
Car Shops and Services
Toys and Wares
All Other Stuff
Jobs and Vacancies
Looking For
Menu
Log in
Register
Reply to thread
See what others are reading now! Try Forums >
Current Activity
Home
The Marketplace
The Marketplace Categories
Hiring Now
Looking for - Electrical / Control & instrumentation Engineers
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="ed78" data-source="post: 1063909152" data-attributes="member: 108920"><p>Power Plant Project in KK - Sabah.</p><p>></p><p>> Looking for:</p><p>> Electrical Engineer</p><p>> Control & Instrumentation Engineer</p><p>></p><p>> Both Positions require the following:</p><p>></p><p>> 1) Minimum 10 years of experience as an Engineer</p><p>> 2) 5 years experience in Gas Fired Powwer Plant or Combined Cycle Gas Turbine.</p><p>></p><p>> Duration</p><p>> The duration of contract employment shall be for an initial period of approximately twenty four (24) months, and may be renewed on a year to year basis, subject to your work performance review and other terms and conditions.</p><p>></p><p>> Working Hours</p><p>> You will be based at Project Site in Sabah, Malaysia</p><p>></p><p>> Working Hours : Monday to Friday, 8.00a.m. to 5.00p.m.</p><p>></p><p>> May be required time to time to work outside the normal working hours and / or during weekends, as and when the circumstances so require.</p><p>> Overtime not paid after normal working hours.</p><p>></p><p>> Annual Leave</p><p>></p><p>> Eligible for paid annual leave of fifteen (15) working days.</p><p>></p><p>> Sick Leave</p><p>></p><p>> Eligible for paid sick leave of up to fourteen (14) days per calendar year.</p><p>></p><p>> Other terms in the contract employment will be spelled out once the candidate is hired and a "Draft" Employment will be sent to vet through.</p><p></p><p>PM me for more details.</p></blockquote><p></p>
[QUOTE="ed78, post: 1063909152, member: 108920"] Power Plant Project in KK - Sabah. > > Looking for: > Electrical Engineer > Control & Instrumentation Engineer > > Both Positions require the following: > > 1) Minimum 10 years of experience as an Engineer > 2) 5 years experience in Gas Fired Powwer Plant or Combined Cycle Gas Turbine. > > Duration > The duration of contract employment shall be for an initial period of approximately twenty four (24) months, and may be renewed on a year to year basis, subject to your work performance review and other terms and conditions. > > Working Hours > You will be based at Project Site in Sabah, Malaysia > > Working Hours : Monday to Friday, 8.00a.m. to 5.00p.m. > > May be required time to time to work outside the normal working hours and / or during weekends, as and when the circumstances so require. > Overtime not paid after normal working hours. > > Annual Leave > > Eligible for paid annual leave of fifteen (15) working days. > > Sick Leave > > Eligible for paid sick leave of up to fourteen (14) days per calendar year. > > Other terms in the contract employment will be spelled out once the candidate is hired and a "Draft" Employment will be sent to vet through. PM me for more details. [/QUOTE]
Insert quotes…
Verification
Post reply
The Marketplace Latest
MITSUBISHI / FE658 (RB/BK S2S)
Started by
PIstonHeads
Chassis and Wheels
Perodua Alza gear up body kit
Started by
jeff6126
Exterior and Body
brake caliper spray
Started by
jeff6126
Exterior and Body
Honda city Mugen gtwing spoiler
Started by
jeff6126
Exterior and Body
Honda Civic FD JSracing GTwing spoiler
Started by
jeff6126
Exterior and Body
Honda civic FC varis GTwing spoiler
Started by
jeff6126
Exterior and Body
JSracing GTwing spoiler
Started by
jeff6126
Exterior and Body
Proton saga drive68 bodykit
Started by
jeff6126
Exterior and Body
Perodua Bezza projectR body kit
Started by
jeff6126
Exterior and Body
Honda city gm6 drive68 body kit
Started by
jeff6126
Exterior and Body
Posts refresh every 5 minutes
Blown gearbox?
So I was being a bit of an idiot. I was standing still and put my foot on the brake and the accelerator to bring boost on to launch. Just before i let go of the brake, something went bang and now I cant select any...
About atr remap
Where to remap ?? How much it cost ?? And how many up increase ??
Front Splitter customized to fit Neo/Legana Bumper for Sale!
http://www.zerotohundred.com/newforums/exterior-and-body/238606-used-front-splitter-for-altezza-myvi-customised-splitter.html#post3067254
Item(s):
Front Splitter - customised to fit altezza with NEO/legana bumper...
Recent Posts
Recommendation: Turbocharger for 4B11 N.A engine
Started by
Mitevo7
Car Modification
2026 Vios HEV launched with Local Battery Assembly - UMW Toyota Motor
Started by
The_Mechanic
News and Features
SPPF: The Future of Automotive Surface Protection - A Technical Overview
Started by
The_Mechanic
News and Features
Upping Wira 1.5 MMC performance
Started by
Nyfka
Car Modification
Volvo Malaysia Launches Locally Assembled ES90 Electric Sedan
Started by
The_Mechanic
News and Features
Search
Online now
Enjoying Zerotohundred?
Log-in
for an ad-less experience
Home
The Marketplace
The Marketplace Categories
Hiring Now
Looking for - Electrical / Control & instrumentation Engineers