Fixed New Thread missing Editor: Hi Everyone, the issue with posting a new thread or a reply that shows a missing editor has been fixed. More updates to the forums will be added on in the coming days, we apologize for the inconveniece this has caused
runner for sunroof installation..
kwl selia letter rm150 (2weeks process)
puspakom endorse rm150 (1day prcess)
endorse on geran rm50 owner must attend at any JPJ branch
all letter and resit from hafcut and installation wokshop needed for this application..
Hi guys...hope u guys r happy with ur altezzas. well....im not. things r not good lately. every morning since the last few day my altz just wong start right. at start ups, the engine will shoot up to 2000rpm n dip...
Done using 3/8" thick plywood... bought from a hardware shop near my place in serdang... de board itself costed RM35 n RM5 for transportation... measuring 4ft x 8ft...